CONTENTS

 

 

1       INTRODUCTION....................................................................................................... 1-1

1.1       Purpose of the Manual........................................................................................ 1-1

1.2       Project Description............................................................................................. 1-2

1.2.1        Introduction........................................................................................... 1-2

1.2.2        Project Location.................................................................................... 1-2

1.2.3        Scope of Project.................................................................................... 1-2

1.3       Construction Programme..................................................................................... 1-4

1.4       Project Organization............................................................................................ 1-4

1.4.1        Introduction........................................................................................... 1-4

1.4.2        Construction Phase................................................................................ 1-4

1.4.3        Operation Phase.................................................................................... 1-7

1.5       Structure of this Manual....................................................................................... 1-7

 

2       AIR QUALITY............................................................................................................. 2-1

2.1       Introduction........................................................................................................ 2-1

2.2       Monitoring during Construction Phase.................................................................. 2-1

2.3       Monitoring during Operation Phase...................................................................... 2-2

2.3.1        Stack Monitoring................................................................................... 2-2

2.3.2       Odour Monitoring................................................................................ 2-4

 

3       HUMAN HEALTH RISK........................................................................................... 3-1

3.1       Introduction........................................................................................................ 3-1

3.2       Monitoring of Radon Concentration..................................................................... 3-1

3.2.1        Baseline Measurement........................................................................... 3-1

3.2.2        Monitoring during Operation Phase......................................................... 3-1

3.2.3        Measurement of Radon Concentration.................................................... 3-1

 

4       WASTE MANAGEMENT IMPLICATIONS............................................................ 4-1

4.1       Introduction........................................................................................................ 4-1

4.2       Waste Management and Control......................................................................... 4-1

4.2.1        Construction Phase................................................................................ 4-1

4.2.2        Operation Phase.................................................................................... 4-3

4.3       Approaches to Prevent Land Contamination........................................................ 4-4

4.3.1        Fuel Oil Spillage Prevention and Handling................................................ 4-4

4.3.2        Chemicals and Chemical Wastes Handling & Spillage Prevention............. 4-6

4.3.3        Incident Record..................................................................................... 4-7

 

5       WATER POLLUTION................................................................................................ 5-1

5.1       Introduction........................................................................................................ 5-1

5.2       Water Quality Parameters................................................................................... 5-1

5.3       Monitoring Equipment......................................................................................... 5-2

5.3.1        Dissolved Oxygen and Temperature Measuring Equipment...................... 5-2

5.3.2        Turbidity Measurement Instrument......................................................... 5-2

5.3.3        pH Measurement Instrument.................................................................. 5-2

5.3.4        Sampler................................................................................................ 5-2

5.3.5        Water Depth Detector........................................................................... 5-2

5.3.6        Sample Containers and Storage.............................................................. 5-3

5.3.7        Monitoring Position Equipment................................................................ 5-3

5.3.8        Calibration of In-Situ Instruments............................................................ 5-3

5.4       Laboratory Measurement / Analysis..................................................................... 5-3

5.5       Monitoring Locations.......................................................................................... 5-4

5.6       Baseline Monitoring............................................................................................. 5-5

5.7       Impact Monitoring............................................................................................... 5-5

5.7.1        Stream Water Quality Monitoring........................................................... 5-5

5.7.2        Marine Water Quality Monitoring........................................................... 5-6

5.8       Event and Action Plan for Water Quality.............................................................. 5-6

5.9       Mitigation Measures............................................................................................ 5-9

5.9.1        Introduction........................................................................................... 5-9

5.9.2        Construction Phase................................................................................ 5-9

5.9.3        Operation Phase.................................................................................. 5-10

 

6       ECOLOGY.................................................................................................................... 6-1

6.1       Introduction........................................................................................................ 6-1

6.2       Pre-construction Phase Monitoring...................................................................... 6-1

6.3       Construction Phase Monitoring............................................................................ 6-1

6.3.1        Introduction........................................................................................... 6-1

6.3.2        Measures to Avoid Mortality of Little Grebe............................................ 6-1

6.3.3        Measures to Minimize Disturbance Impact to Wildlife.............................. 6-2

6.3.4        Measures to Minimize Impact to Habitats................................................ 6-3

6.3.5        Measures to Mitigate and Compensate for the Loss of Vegetation............ 6-5

6.3.6        Measures to Create Additional Habitat for Little Grebe............................ 6-5

6.4       Post-construction Phase Monitoring..................................................................... 6-5

6.4.1        Introduction........................................................................................... 6-5

6.4.2        Site Condition and Bird Monitoring.......................................................... 6-5

6.5       Event and Action Plan......................................................................................... 6-6

 

7       LANDSCAPE AND VISUAL IMPACT..................................................................... 7-1

7.1       Introduction........................................................................................................ 7-1

7.2       Mitigation Measures............................................................................................ 7-1

7.3       Design Phase Audit............................................................................................. 7-1

7.4       Baseline Review.................................................................................................. 7-2

7.5       Construction and Operation Phase Audit............................................................. 7-2

 

8       LANDFILL GAS HAZARD........................................................................................ 8-1

8.1       Introduction........................................................................................................ 8-1

8.2       Monitoring and Measurement of Landfill Gas................................ 8-1

 

9       SITE ENVIRONMENTAL AUDIT & ENVIRONMENTAL COMPLAINTS....... 9-1

9.1       Site Inspection.................................................................................................... 9-1

9.2       Compliance with Legal and Contractual Requirements.......................................... 9-2

9.3       Environmental Complaints................................................................................... 9-2

 

10     REPORTING............................................................................................................. 10-1

10.1     General............................................................................................................. 10-1

10.2     Baseline Monitoring Report............................................................................... 10-1

10.3     Monthly EM&A Reports................................................................................... 10-2

10.4     Quarterly EM&A Summary Reports.................................................................. 10-5

10.5     Final EM&A Review Report............................................................................. 10-6

10.6     Data Keeping.................................................................................................... 10-8

10.7     Interim Notifications of Environmental Quality Limit Exceedances....................... 10-8

 

List of Appendices

 

Appendix 3.1     Protocol for Radon Measurement for Non-Residential Building

Appendix 5.1     Sample Data Sheet for Water Quality Monitoring

Appendix 9.1     Implementation Schedule of Mitigation Measures

Appendix 10.1   Sample Template for Interim Notifications

 

 

List of Figures

 

Figure 1.1         Location Plan of Proposed Sludge Treatment Facilities

Figure 1.2         Project Area Boundary of Sludge Treatment Facilities

Figure 1.3         General Layout of Proposed Sludge Treatment Facilities (STF)

Figure 1.4         General Layout of Incineration System

Figure 1.5         Project Organization - EM&A Programme for Construction Phase

Figure 1.6         Project Organization - EM&A Programme for Operation Phase

Figure 5.1         Locations of Water Quality Monitoring Stations

Figure 9.1         Environmental Complaint Flow Diagram

 

 

List of Tables

 

Table 1.1          Construction Programme

Table 2.1          Analytical Parameters and Methodology

Table 2.2          Odour Intensity Level

Table 2.3          Action and Limit Levels for Odour Nuisance

Table 2.4          Event and Action Plan for Odour Monitoring

Table 7.1          Proposed Landscape and Visual Mitigation Measures in Construction Phase

Table 7.2          Proposed Landscape and Visual Mitigation Measures in Operation Phase

Table 8.1          Actions to be Encompassed